impact-promise Put me on the waitlist

Stakeholder Dialogue & Social Impact

What surfaces when the internal picture and the external picture are placed side by side

The problem, without product words

Management thinks the most important stakeholders stand behind the course. That picture comes from conversations held mostly with the contacts who always respond, always contribute ideas, always are reachable. Who is critical, who has disengaged, or who is never called, does not appear in that picture. Meanwhile four departments speak separately with the same party, each with their own question and their own commitment. No one records exactly what was promised. A year later that commitment comes back as a complaint, and no one at the board table saw the signal in time, because it stayed stuck along the way at a department that did not consider it important enough to pass on itself.

What exactly comes out of it

The core is the Trust Baseline: an internal survey among management, alongside an external survey among stakeholders, following one fixed conversation format. The difference between what management thinks stakeholders believe and what stakeholders themselves say becomes visible in a baseline report. In addition, an influence × impact matrix emerges, with an owner per relationship who is accountable for the contact. Commitments get a place in a commitment tracker, with a clock on it, so that a commitment does not silently disappear until it comes back as a complaint. A signal rhythm is created that determines how and when relevant signals reach the board table, instead of staying stuck at the department that heard them first. Stakeholders also score in the double materiality analysis, read-first with esgia, so that the stakeholder picture counts there too. How it works describes the steps from input to remeasurement in detail, and Outcomes shows what the report, matrix and tracker look like in substance.

Where the data comes from

Every outcome can be traced to a concrete input. The internal survey comes from management itself, completed according to the same format as the external questionnaire, so that the two pictures are comparable and not differently worded by coincidence. The external survey goes to the stakeholders recorded at the start, with the same questions for everyone, so that the difference in answer lies in the relationship and not in the phrasing of the question. The matrix links influence and impact to an owner per relationship, so that it is clear who maintains which contact. The tracker registers commitments at the moment they are made, with a date, so that a commitment has a trail instead of a loose memory. Nothing in the report comes from an estimate or a feeling; everything can be traced back to who answered what, when, and according to which format.

What it is not

The tool has no track record to demonstrate that trust actually increases after use. There are no completed engagement programs to refer to, and this is not concealed here: the tool structures the survey and makes the difference between perception and reality visible, it does not prove a track record. The tool also does not hold conversations outside the fixed circle of known stakeholders; anyone wanting a baseline measurement among parties with whom there is currently no contact, using the questionnaire as a script for that conversation, uses route 2 for that. And the tool makes no statement about the outcome of all that structuring: it records, it signals, it makes the difference visible between what management thinks and what stakeholders say. What an organization does with those signals afterward, which commitment is still honored and which relationship is reconsidered, is up to the organization itself, not up to the report.

Three routes

Route 1 is doing it yourself: the matrix, the tracker, the signal rhythm and the format questionnaires are filled in and managed by the organization itself, with an annual remeasurement to see whether the difference between the internal and external picture is shrinking. Route 2 is partially guided: a partner conducts the external conversations outside the fixed circle, the questionnaire then serves as a script, and the tool aggregates the outcomes into the same matrix and the same report. Route 3 is outsourcing: a full engagement program at the partner, with the baseline as the zero measurement against which later measurements are set off. Anyone wanting to read more about how materiality, stakeholder data and reporting frameworks connect finds background in the knowledge base.

Waiting list, not a button

The tool has not been built yet. The button on this page is in waiting-list mode, and that is not temporary text but the current state of affairs: anyone who signs up receives a message as soon as the first version becomes available, not an access that already exists today.

Bringing stakeholder trust structurally into view is one step; the other step is knowing which tasks, hours and systems are needed internally for that, and that is exactly where the work scan from FTE TO AI (ftetoai.com) begins.

Rachaelde assistent van de Trust Baseline

Vraag maar. Het interessantste antwoord komt meestal van wie u nog niet heeft gesproken.

Answers come from this site’s knowledge base. Not tailored advice, and not a scan of your company.