Who decides whether a signal is urgent

A signal comes in. A letter from a nearby resident, a critical question from a regulator, a message circulating within a trade association. Someone in the organisation sees it first. And then the question begins that more often remains unanswered than is desirable: should this go up now, or can it wait until the next meeting.

That question is usually answered by whoever gets hold of the signal first. Not because that person is best equipped for it, but because there is no other arrangement in place. Urgency then arises by chance, depending on who happens to be on duty that day, how busy the management's agenda is, and whether the topic happens to have already been discussed before.

The difference between important and urgent

Not every signal that matters is urgent. And not every urgent signal is immediately large. A small commitment that is not honoured can cost more trust than the absence of a large investment. That makes the question of who decides what should go up more complicated than a simple triage based on size. A distinction is needed between what is large and what is sensitive, and that distinction requires a fixed point where that judgement is made, not an individual assessment that differs each time.

Without that fixed point, a pattern emerges in which some signals escalate too quickly, out of caution, and others too late, out of habit. Both are a problem. The first fills the agenda of the board and management with noise. The second allows a sensitive signal to sit unreported for weeks before someone flags it.

A rhythm instead of a reflex

The solution does not lie in sharper definitions of what is urgent. Such definitions often already exist, on paper, and still do not work, because practice does not follow categories. What does help is a rhythm: a fixed moment at which signals are collected, weighed and, where necessary, escalated. That rhythm does not determine in advance what is urgent, but ensures that the question is asked structurally, rather than incidentally.

The question how often do you report on stakeholders therefore does not belong to the communications department alone. It is a board-level question, because the frequency of reporting determines how quickly a signal even gets the chance to be recognised as urgent in the first place. A quarterly rhythm allows for something different than a weekly rhythm. Neither is inherently better; it depends on the organisation's exposure and on how quickly the environment reacts to what happens.

What belongs on the agenda, and what does not

Not every signal deserves a place at the boardroom table. The question which signals belong on the boardroom table concerns that selection, and that selection is one of the most difficult parts of the entire process. Letting too many signals through undermines the authority of the table; letting too few signals through undermines the trust of whoever raised the signal.

That is why it does not work to let urgency be determined by one person, at one moment, without a fixed form. There is a need for a place where stakeholder work structurally returns, rather than as a separate agenda item that disappears as soon as something else comes up. That is the question addressed under how does stakeholder work get a fixed place on the agenda and who decides that: not who sees the signal, but who has the authority to say that it must be discussed now.

Form without substance does not help

A fixed place on the agenda does not yet mean that the signal is also discussed in a usable way. What belongs in a signal report determines whether the boardroom table can act or can only take note. The page what belongs in a signal report addresses that form: what information is needed to form a judgement, and what information only adds noise.

What the Trust Baseline does in this regard

The Trust Baseline is not built to say what is urgent. This instrument cannot do that, and it does not claim to. What it does do is record the difference between what management thinks it knows about stakeholders and what is actually being said, through an internal survey alongside an external one. That difference is one of the sources from which signals arise that call for urgency. The commitment tracker then keeps track of which commitments have been made and whether they have been honoured, precisely because a missed small commitment often weighs more heavily than a missed large ambition. The signal rhythm ensures that these two sources come together at a fixed moment, rather than continuing to exist separately.

The tool is under construction. Anyone who wants to make use of this can sign up for the waiting list; there is not yet a working version to offer.

The question of when a signal is urgent depends in part on who takes it up and how much time is available for this within the organisation. Anyone who wants to know which part of the stakeholder work, from signalling to reporting, can be taken over by AI, can have this calculated with the work scan from FTE TO AI, which maps out per task which part of the work qualifies for this.

Rachaelde assistent van de Trust Baseline

Vraag maar. Het interessantste antwoord komt meestal van wie u nog niet heeft gesproken.

Answers come from this site’s knowledge base. Not tailored advice, and not a scan of your company.